![]() |
| The Hot Man himself. ;) |
I have some extra time to relax and work on the layout. Today I caulked down the rest of the track in the helix and started laying and caulking down track, and cutting in switches on the lower level.
| Track and switches installed on part of the lower level. |
I also finished gluing down the rest of the cork sheets in the York Yard sections. Baring any spontaneous BBQ's tomorrow, I should be able to get more done. We'll see. :)

No comments:
Post a Comment