Friday, January 2, 2015

First Prototype Structure Appears on the Layout..

The first structure to be built for the railroad made it's first appearance on the layout, albeit just to be test fitted before the final touches are put on it.  It's a card stock photo building built out of textures from Clever Models and 140lb paper card stock reinforcement.  

T.H. Knisely covered coal trestle.  Notice the vegetation growing around the bottom of the trestle. The photo was taken in 1963 or 1964, and photographer was standing on front of Ma & Pa locomotive #82 while diesel was pulling a freight train north.

Photo from the Alan J. Frame collection used by permission of The Ma & Pa Historical Society archives. 

Side View.

Here's an angle that kind of matches the prototype.  What do you think?

It was a fun project, and I think it came out nice.  My friend Dave Ramos has been building buildings on his NY Harbor Layout using the Clever Models Textures and I plan on trying more of my buildings and flats using them.

Wednesday, December 31, 2014

ordo ab chao- out of chaos, comes order, part 2..

I've been using my vacation time doing a lot of things I meant to get done around the layout room and haven't.  One of the most important things that I've put off for way to long was to rearrange the layout room/family room to make it easier to work down there more comfortably and to get it back to functioning as a family space.

 Before:


Old location of my desk/workbench.

My stepson Nick's desk, boxed in by couches, boxes, and various other brick-a-brac.

After:


Sofas and easy chair relocated to a more useful location.  Nick's desk now occupies my desk's old location.  The Large TV will be replaced by a wall mounted flat screen.  Anyone need a TV?

My workbench now is located nearer to the layout.  The computer that will control the JMRI system and WiFi throttles is now where it needs to be.

Since rearranging the space, I've found it so much more comfortable to spend time there and this has meant working on the layout is so much more enjoyable.  I wish I would have done this sooner. 

Saturday, December 27, 2014

You may delay, but time will not. Benjamin Franklin

It's been awhile since I wrote a "real" post.  Aside from my yearly Christmas joke post it's been over a month.  Not that I haven't been working on the layout.  I've actually gotten a bunch of things accomplished and will be writing a few blog posts over the next week or two covering them all.

Christmas Eve, one of my presents to myself arrived via USPS priority mail:  GML Enterprises (Model Railroad Electronic Controls) Fast Clock System. 

http://www.thegmlenterprises.com/id19.html 

From the website: "This system design is for one (1) clock controller unit (Model #FC-6) and up to eight (8) remote analog clock units (Model #CLK-x). This CONTROLLER/REMOTE approach allows the installation of the controller in your dispatch panel and placement of a minimum of 2 and up to 8 remote units anywhere on your layout."

My friend Ted Pamperin Has used this system for awhile on his C&O layout so I know it works well.



I chose the 2:1 through 6:1 time ratios when I had this unit built.  The slow pace of operations on my layout will mean I'll probably be operating between 2:1 and 4:1.


All in all the whole system cost me $176 (controller, 2 clocks, optional time ratios).  I think that's a good price for a well built system.  Hopefully I'll get it installed this week while I'm off for Christmas break.

Prologue:

After publishing this post I went down to the basement and decided on trying to install the fast clock.  1 1/2 hours later it was done!  

One clock installed in the layout area.

Control unit installed and working.

I decided to install the control unit in the main layout area.

The second clock is installed inside the helix where it's everybody's favorite place to be a dispatcher.  OK, maybe it's not, but the clock can be easily moved if I move the dispatcher to another location.

The installation couldn't have been any easier and the system works great!  I'm very pleased. :)



 


Thursday, December 25, 2014

Merry Christmas from my family to yours!



Merry Christmas
Everyone!



"I knew I shouldn't have let Craig wire my DCC system for me."

Tuesday, November 11, 2014

It's Curtains for you Rocky, curtains...



Ever give one of those gifts that give back to you?  I did.  Amy wanted a new sewing machine and we went out and bought her a nice one.  She's been doing all kinds of craft projects and hemming some clothes she used to bring to her mother to get done.  So a natural project for me to ask her to do was to make some curtain skirts for the bottom of the layout.  We found a whole roll of black fabric on clearance at Wall-mart and she went to work on sewing my layout skirting.  She did a great job!  Boy do I love that girl. ;)

My Sweetheart working on the layout skirting with her new sewing machine. :)





As you can see the skirts came out nice.

When we bought the roll of cloth, we thought we had too much.  But as it turns out, we barely had enough to cover the main part of the layout.  I need to go out and find some more so we can do the helix and then the skirting project will be complete. :)

I'm very happy how neat the layout space looks now with the skirting up.  All the clutter underneath the layout is now out of sight.  :)


Wednesday, November 5, 2014

NJ LD/OP and RPM Meet a Success!

The NJ LD/OP and RPM Meet held Oct. 25th and 26th was a great success!  Though attendance was down slightly from last year, do to the meet being the same weekend as the Timonium show, we were able to raise a lot more money this year.  This time around we were able to donate $700 to help establish a scholarship for Special Education Students who want to further their education after graduating UCTECH plus we donated another $500 to the UCTECH SKILLS USA Chapter to help offset travel costs to go to Nationals this year.  This makes the school happy, which guarantees we can keep holding the meet there, which in turn makes us happy.  A win win if you ask me ;)


My friend and fellow Ma & Pa Society Member Art Kuperstein manned a table for the Society at the meet.  Art also took all the photos in this post.

Rob Hinkle put up a display showing his plans and design for his Reading RR based layout as part of the Layout Design SIG display portion of the meet.

Lots of RPM models and dioramas were on display in the RPM section.

More RPM Models.

The Commodore (Ralph Heiss) gave a hands on clinic on using Pan Pastels for weathering.

I had a display showing scenes from the prototype Ma & Pa that I'm modeling from, along with some maps and track plan.


And yes, I finally remembered to take some  pictures during a open house!

There is a lot more information and pictures on our website:

http://www.hansmanns.org/ld-op-nj/index.htm

On a serious note, we will be changing the meet logo and name next year due to the Operations SIG asking meet organizers not to have them listed as co-sponsors, or using the SIG's name or any likeness of their logo in any meet publicity.  They are concerned over liability issues.  I think it's a shame and short sided on their part because there are so many operations weekends that are put on by the SIG members and those, along with our meet, have always been used to highlight the Op SIG and the benefits of signing up and belonging.  I can only see where this will be harmful to growing and keeping their membership up.  Anyway, next year look for a new name and logo for the NJ Meet which will probably just be shortened to the NJ Layout Design and RPM Meet since the LD SIG doesn't seem to have the same worries as the Op SIG.

Thursday, October 23, 2014

NJ LD Sig and RPM Meet this weekend

The second annual NJ LD Sig and RPM Meet will be held again at Union County Vocational in Scotch Plains.  If you are in the area stop in and enjoy 2 days of activities.  Saturday is a day of clinics and RPM displays and an evening layout tour of 3 layouts.  Sunday is a full day self guided layout tour with 8 more layouts to see, including my Ma & Pa Pennsylvania District layout.  All moneys raised after expenses goes towards the UCTECH Awards and Scholarship fund and SKILLS USA.

Check out the website for details: